Difference between revisions of "Pustaka Negeri Sarawak, Sibu"

From PustakaPedia
Jump to: navigation, search
Line 1: Line 1:
 
[[File:PustakaSibu.jpg|thumb|Artist impression of Pustaka Sibu's building]]
 
[[File:PustakaSibu.jpg|thumb|Artist impression of Pustaka Sibu's building]]
[[File:Org Chart Sibu.001.jpeg|thumb|Sibu Organisational Chart]]
 
 
 
Pustaka Negeri Sarawak, Sibu is the latest addition to the existing campuses besides Kuching, Miri and SRR.
 
Pustaka Negeri Sarawak, Sibu is the latest addition to the existing campuses besides Kuching, Miri and SRR.
  
Line 30: Line 28:
  
 
== Staff ==
 
== Staff ==
 +
[[File:Org Chart Sibu.001.jpeg|thumb|Sibu Organisational Chart, updated 20 Nov 2019]]
 
<ol>
 
<ol>
 
'''Batch 1 : January 2018'''
 
'''Batch 1 : January 2018'''
Line 72: Line 71:
 
   <li> Faeza Hanim binti Morshidi</li>
 
   <li> Faeza Hanim binti Morshidi</li>
 
   <li> Mohamnmad Noor Idzhwan bin Sarkawi</li>
 
   <li> Mohamnmad Noor Idzhwan bin Sarkawi</li>
<ol>
+
</ol>
 
 
==Organisational Chart ==
 
 
 
<gallery>
 
Org Chart Sibu.001.jpeg|Sibu Organisational Chart
 
</gallery>
 
  
 
== Divisions in Sibu ==
 
== Divisions in Sibu ==

Revision as of 11:45, 20 November 2019

Artist impression of Pustaka Sibu's building

Pustaka Negeri Sarawak, Sibu is the latest addition to the existing campuses besides Kuching, Miri and SRR.

Project Description

Project Particulars :

  1. Letter of Acceptance : 28 .10.2016
  2. Date of Commencement : 25.11.2016
  3. Contract Period : Twenty four (24) months
  4. Date of Completion : 24.11.2018
  5. Revised Completion Date :
    1. EOT No.1=27 days, 21 December 2018, Reason:EIW
    2. EOT No.2=210 days, 19 July 2019, Reason:lift design change
    3. EOT No.3=196 days, 31 January 2020, Reason:tba
  6. Contract Sum : RM 30,768,126.84
  7. Contractor : Woodville Jaya Sdn. Bhd.
  8. Project Director : Regional Manager, Central Regional Office, JKR SARAWAK

History

Construction of Sibu Library is a node of the Sarawak State Library (Pustaka) in the central zone of Sarawak. It is in line with SITRC Meeting No.1 / 2002 dated 27 February 2002 stating that "Regional Centers for Pustaka will be located in Sibu and Miri". The project is also in line with the aspirations and policies of the Sarawak State Government to set up information centers in major cities in the state.

The project is a direct negotiated contract and started in 2001 with an initial grant of RM300,000. Since then many discussions have been made to determine the concept of the library. In 2005 the Land and Survey Department approved Lot 456, Block 1, Sungai Merah Town District, Sibu as the project site. From 2006 to 2010 the project was dismissed as there was no provision.

In spite of this, in 2011, the Public Works Department was directed by the Ministry of Infrastructure and Communications Development to re-implement the Sibu Library project with ceiling cost of RM25,000,000. In the same year, the Department of Land and Surveys had extended the tenure of placement at Lot 456, Block 1, Sungai Merah Town District, Sibu for two (2) years starting April 12, 2011. From 2011 to 2012, the project allocation of RM15,000,000 has been transferred to the Library account to finance project implementation.

In 2013, the original site of the project at Lot 456, Block 1, Sungai Merah Town District, Sibu was canceled and replaced with Lot 1054 in the same district. The site change took place again in 2014, where Lot 1054 was canceled and replaced with Lot 1607. The exchange of this project site requires the Library and the Public Works Department to submit a building plan and site plan to the appropriate authority for approval. This sequence of events is a major factor that has caused delays in the implementation of the Sibu Library project.

Staff

Sibu Organisational Chart, updated 20 Nov 2019
    Batch 1 : January 2018
  1. Afiza binti Ibrahim
  2. Heliza Binti Rapaie
  3. Muhammad Aufa Bin Mohamad Jamaludin
  4. Suhaimi Bemban
  5. Dzairil Erwan bin Sapar
  6. Batch 2 : July 2018

  7. Fairul Azli Banchit
  8. Batch 3 : November 2018 (New intake)

  9. Nurfarathul Aqma binti Julani
  10. Nur Faziella Syazmeen binti Hasli
  11. Fiona Ravia
  12. Nur Amanina binti Mastani
  13. Mohd Feizul bin Median
  14. Nurrul Azzila binti Abdul Rasid
  15. Shahrieza binti Rabaie
  16. Mohd Tarmizi bin Malek
  17. Mohd Asraf Bin Abdul Wahab
  18. Ebby Saifullah bin Suhaimi
  19. Fatin Fahsa binti Adenan
  20. Aida Suraya Yaseer binti Samson
  21. Batch 4 : February 2019 (New intake)

  22. Mas Azreena binti Majenis
  23. Safwan Hanif bin Osman
  24. Sofea binti Syarif
  25. Batch 5 : November 2019 (New intake)

  26. Annasyah binti Hajemi
  27. Norzieana binti Mohammad Nasir
  28. Mohamad Nazrin bin Mohamad Junaidi
  29. Nur Syahida binti Ispawi
  30. Bibiana Nain Anak Ugop
  31. Faeza Hanim binti Morshidi
  32. Mohamnmad Noor Idzhwan bin Sarkawi

Divisions in Sibu