Difference between revisions of "Building and Civil"

From PustakaPedia
Jump to: navigation, search
(Duty and Responsibility Of Assistant Engineer (Building))
(Work Process)
Line 22: Line 22:
 
== '''Work Process''' ==
 
== '''Work Process''' ==
 
1. To receive Public Complaint.
 
1. To receive Public Complaint.
:A. Complainer fill in the Form (Borang Aduan Kerosakan/ Kebersihan) and submit to Facility Management unit.
+
:a. Complainer fill in the Form (Borang Aduan Kerosakan/ Kebersihan) and submit to Facility Management unit.
:B. The appointed Assistant Engineer will go through the form.
+
:b. The appointed Assistant Engineer will go through the form.
:C. Inspection will be carried out to determine the extent of damage or etc.
+
:c. Inspection will be carried out to determine the extent of damage or etc.
:D. Minor damage - the work will carried out by internal.
+
:d. Minor damage - the work will carried out by internal.
 
::Major damage - the work will carried out by contractor (outsource)
 
::Major damage - the work will carried out by contractor (outsource)
:E. To prepare report and record it.  
+
:e. To prepare report and record it.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
==References==
 
==References==

Revision as of 08:29, 13 October 2020

Duty and Responsibility Of Assistant Engineer (Building)

1. To receive public complaint by complainer.

2. Execute preventive maintenance and minor repair on the office fixture and fittings and minor electrical works as per scheduled.

3.To inspect, monitor, supervise, check, and report :

a. Housekeeping work by designated contractor. (The work done have to comply with tender document)
b. Plumbing work done by contractors.(Leak/ Clog/ Upgrade toilet accessories and etc.)
c. Landscape work done by contractors. (Fertilize, Grass cutting, pruning and etc.)
d. Building and civil work done by contractors.(Painting, Gutter clog, Flushing, Sewage treatment and etc.)

4. To receive booking facilities, set-up venues, monitor and assist event during function held at rental facilities.

5. To check security patrol (Guard Tour System and Log Book).

6. To make sure the building comply with [1] Sarawak Building Ordinance and [2]Uniform Building By Law

Work Process

1. To receive Public Complaint.

a. Complainer fill in the Form (Borang Aduan Kerosakan/ Kebersihan) and submit to Facility Management unit.
b. The appointed Assistant Engineer will go through the form.
c. Inspection will be carried out to determine the extent of damage or etc.
d. Minor damage - the work will carried out by internal.
Major damage - the work will carried out by contractor (outsource)
e. To prepare report and record it.

References

  1. Sarawak Building Ordinance
  2. Uniform Building By Law